Gujrat was never behind in the race of development and now it is going to launch another metro city. Yes, after Ahemadabad, Surat is the next city to be a metro city. So here I will share some crucial information related to the Surat Metro Project.
In this write-up, we will keep an eye on the Metro Project of Surat details and will talk about aspects related to it including the Surat metro map, Surat metro route, Surat metro station list, Surat metro cost of construction, Surat metro completion date, Surat metro budget, Surat metro construction company, Surat metro project contractor name, Surat metro first phase, etc. So let’s get started with the Surat Metro Rail Project details.
Surat Metro Project Details
Surat Metro Project is an under-construction 41km long mass rapid transit system that will be the combination of on-ground and underground metro rail systems. It is aimed to serve the city with a better and fast public transit option and also to connect the city as well.
There are several details that remained to be discussed about the metro project of Surat. So let’s further move to the Surat Metro Construction Company, cost, and many more.
Surat Metro Construction Company
The Surat Metro Construction company name is Dilip Buildcon Limited which is also the contractor of the Indore Metro Project and Bhopal Metro Project. Actually, there has been an executive authority, Gujrat Metro Rail Corporation (GMRC) that is a joint venture between the state Government of Gujrat and the Central Government of India as an awarding body of the Metro Project.
There are several other Surat Metro Contractors that are part of other construction work.
Surat Metro Project Cost
The estimated Surat Metro Project cost is ₹12,020.32 Crore. According to the media reports, French Development Agency has funded the project with an amount of Rs 1970 Crore.
Apart from that, some amount is raised through loans from Germany Development Bank KfW. A few days ago there was news that KfW has also given an additional loan of Rs 3,464 crore for the Surat Metro Rail Project.
Want To Know: About Indore Metro Project – Cost, Construction Update, Map, & Everything?
Surat Metro First Phase
Surat Metro First Phase is under construction and is consist of two lines – Line 1 & Line 2. Line 1 is named Red Line and Line 2 is named Line Green. So the Surat Metro Project Phase 1 will be completed with the completion of Line Red and Line Green.
A very small segment of the Surat Metro First Phase is expected to be completed in 2024 while the whole phase will be ready in 2027. Let’s have a detailed talk about the Red Line and Green Line construction.
Read Also: About Bhopal Metro Project – Cost, Construction Update, Map, Route, & Everything?
Surat Metro Route
Surat Metro Rail Project is the second metro project of the Gujrat state and going well with the planning. And the planning of the construction includes Red Line and Green Line. Here I am sharing the Surat Metro Route of Red Line and Green Line.
Surat Metro Line 1 Route
Line 1 or Red Line Route – (Sarthana to DREAM City)
Surat Metro Line 1 Route will connect Sarthana to Dream City by covering a total length of 21.61km. Out of which 15.14 km will be elevated and the rest 6.47 km will be underground. There will be a total of 20 Metro stations on this line.
Surat Metro Line 2 Route
Line 2 or Green Line Route – (Bhesan to Saroli)
Surat Metro Line 2 route will connect Bhesan to Saroli by covering a total distance of 18.74 km elevated metro system. There will be a total of 18 metro stations on this line.
Want To Know: Government Project – What Is ONDC? How To Use ONDC in 2023?
Surat Metro Map
By reading Surat Metro Map you can understand the routes of Line 1 and Line 2 more significantly. So here I am sharing the Surat Metro Map with Red Line and Green Line route markings.
Do You Know: How To Sell Your Products On ONDC? A Complete Guide.
Surat Metro Station List
Currently, two lines are in the development stage in the Metro Project of Surat, so the station list of both lines or corridors is as follows.
Red Line or Line 1 Station List
The Surat Metro station list of line 1 consists of 20 elevated and underground metro stations that are given below.
- Sarthana
- Nature Park
- Varachha Chopati Garden
- Shri Swaminarayan Mandir Kalakunj
- Kapodra
- Labheshwar Chowk
- Central Warehouse
- Surat Railway Station
- Maskati Hospital
- Gandhi Baug
- Kadarsha Ni Nal
- Majura Gate (Interchange to Line 2)
- Rupali Canal
- Althan Tenament
- Althan Gam
- VIP Road
- Woman ITI
- Bhimrad
- Convention Center
- DREAM City
Do You Know: What Is NMACC (Nita Mukesh Ambani Cultural Centre)? – Cost, Interesting Facts, & Many More
Green Line or Line 2 Station List
The Surat Metro station list of line 2 consists of 18 elevated metro stations that are given below.
- Bhesan
- Botanical Garden
- Ugat Vaarigruh
- Palanpur Road
- LP Savani School
- Performing Art Centre
- Adajan Gam
- Jagdish Chandra Bose Aquarium
- Badri Narayan Temple
- Athwa Chopati
- Majura Gate (Interchange to Line 1)
- Udhna Dawaja
- Kamela Darwaja
- Anjana Farm
- Model Town
- Magob
- Bharat Cancer Hospital
- Saroli
Do You Know: About Chandrayaan 3 Mission – Launch Date, Budget, & Everything You Need Know
Surat Metro Completion Date
The time to complete the Metro rail project in Surat was earlier fixed for September 2023 but now it has been shifted to the year 2024 it is only a matter of a small segment of the project, it will take up to 2027 to complete the Surat Metro project phase 1.
Want To Know: What is Third Unicorn Private Limited? – Ashneer Grover’s New Startup
Final Words
Metro will bring a new speed to the city of textile. Surat Metro Rail Project will link the city and it will be a great advantage in purpose for the development of the city and to serve the city.
In this write-up, I have provided certain details about the Surat Metro Rail Project including the map of Surat metro, Surat metro route, Surat metro station list, Surat metro project cost, Surat metro completion date, Surat metro budget, Surat metro construction company, Surat metro contractor name, Surat metro first phase, etc.
Hope the content was useful and informative enough for you. Thanks for reading.
Want To Know: Many Interesting Things About India?
FAQs
Which company is making the metro in Surat?
Gujrat Metro Rail Corporation is the joint venture of Gujrat Government and Indian Government created for the development of Metro in the state. Apart from the Surat Metro construction company name is Dilip Buildcon Limited and there are several contractors for different work
What is the status of the Surat metro project?
Metro Project in Surat is under development for phase 1 which includes the construction of two corridors, Line 1 (Red Line) and Line 2 (Green Line). Phase 1 is expected to be completed by December 2027 whereas a decided small segment will be ready by September 2024. The Surat Metro Project cost is nearly Rs 12,000 Crore for Phase 1.